Sunday, August 1, 2010

Construction almost complete

The large electronic signs still state that Gold Run
Road is closed. It is not. This weekend it has been
so lovely to be free of the noise and dust of the
machines going up and down the road.

There is still work to be done on the culverts, but
the road is open and they should have them finished
this week. The paving may be postponed. So much
of the road has been dug up and refilled the engineers
are afraid that the new paving would sink as the
filled areas sink. They may just patch and pave
next year. As far as I'm concerned I've had it
and hope they do as little as possible and get
out of our lives.

I have made hundreds of calls for Bennet and
still have more to do.

Ariel was here this weekend and that kept me
busy. We had an in door project and we
rebuilt the dam in the creek. She is almost
as tall as I I've lost inches so am only
5' 5.5" and she is 5' 3". Won't be long
before she is taller than I especially if
I continue to shrink 1/2 inch or more a
year!